Our valuable customer is already operating five of our
concrete plants and we take extreme pride in being chosen by them for the
supply of a plant for their road construction project in Tarsus,
Mersin.
The plant is designed for 300 tons per-hour production
capacity and the result has already
surpassed expectations.
Three stage impact crusher provided the following
advantages;
*Loading maximized:
With a large unobstructed feed opening, the primary
impact crusher fed with material blocks the size of its feed opening.
*Cubical products:
The final shape delivered aims to meet the exacting
specifications for flakiness and elongation required to produce asphalt and
concrete products.
*Stringent output and productivity demand:
Impact crusher for unrivaled flexibility, and
performance and ensures high reduction ratios.
*Versatility:
Hydraulically adjustable breaker plates and tip speed
enable a wide range of end-product gradations to be achieved.
EQUIPMENT SELECTION
Feed Hopper with 30 m³ volume,
MSF 1276 Pan Feeder with Grizzly Scalper
MPI 1313 Primary Impact Crusher
MSI 1312 Secondary Impact Crusher
MTI 1110 Tertiary Impact Crusher
MS 2060/4 Inclined Screens (2 pcs)
MSH 1650/3 Heavy-duty Inclined Screen
4x60 m³ Product Silos for Truck Loading
Belt Conveyors
Electrical Control System
MEKA contributes to Georgia's hydroelectric developments by providing the M100 mobile concrete batching plant for two major power plant projects in the Guria region. With a production capacity of 100 m³ per hour and durable features designed for challenging environments, MEKA ensures efficient concrete production, reinforcing its commitment to excellence in global infrastructure projects.
MoreThe Tunisian company, one of the largest contracting companies in the country, which will realize the important highway project in Tunisia, did not want to take risks in this critical project and preferred MEKA MB-100W batching plant.
MoreThe Mexican aggregate production industry is evolving faster than ever. The increasing demand for roads, housing and infrastructure in the country creates a need to produce more and more raw materials at competitive prices with minimal environmental impact. The constant and consistent supply of quality aggregates is one of the industry’s prime challenges.
MoreIn our 250 t/h capacity plant, which we established in Bou Saâda, Algeria, superior performance and efficiency have been achieved.
More