A Dependable Solution Partner
It is no surprise that MEKA is becoming a reliable partner for many projects all over the world. Being able to engineer and manufacture the complete project in-house has allowed us to serve the quality and reliability expectations of our customers.
Serving the best of best
MEKA takes extreme pride in being selected by our customer for the complete supply of a new ore installation of raw material in Cayambe, Ecuador. Being a leading global producer of calcium carbonate and a worldwide distributor of specialty chemicals, OMYA has more than 130 years of experience and has more than 175 plants in over 50 countries.
A Custom Solution Tailored to Project
We have an extensive knowledge base and adaptability when it comes to specialty.
The design process and the selection of equipment for this plant had to comply with a long list of pre-requisites. These pre-requisites stemmed from a long list of conditions, which included particularly the following domains.
Plant Design Criteria
The maximum size of the blocks should be 40 mm along any direction,
Low amount of fines, maximum 10% < 10 mm
Equipment Selection
FEED HOPPER with 20 m³ volume,
MPF 935 PAN FEEDER with variable speed drive,
MWF 1035 WOBBLER FEEDER with 30 mm gap setting,
MPI 1111/3 PRIMARY with 3 breaker plates and variable speed drive,
MS 1230/2 INCLINED SCREEN with dust encapsulation,
BELT CONVEYORS
Despite the difficulties the Global Pandemic has presented, the plant is brought successfully into operation in 2021, and MEKA has proven once more that it is the choice of professionals, and it continues to provide services for the industry with its strong engineering infrastructure and to be one of the best choices in important projects worldwide.
MEKA contributes to Georgia's hydroelectric developments by providing the M100 mobile concrete batching plant for two major power plant projects in the Guria region. With a production capacity of 100 m³ per hour and durable features designed for challenging environments, MEKA ensures efficient concrete production, reinforcing its commitment to excellence in global infrastructure projects.
MoreThe Tunisian company, one of the largest contracting companies in the country, which will realize the important highway project in Tunisia, did not want to take risks in this critical project and preferred MEKA MB-100W batching plant.
MoreThe Mexican aggregate production industry is evolving faster than ever. The increasing demand for roads, housing and infrastructure in the country creates a need to produce more and more raw materials at competitive prices with minimal environmental impact. The constant and consistent supply of quality aggregates is one of the industry’s prime challenges.