The Tema Motorway forms an integral part of the Trans-Africa Highway, stretching from Lagos through Lomé, Accra, and Abidjan to Dakar, and effectively serves as the junction to the Sub-region. Grade Separation of Tema intersection in Tema, is being undertaken by Shimizu-Dai Nippon JV. This project provides a solution for traffic congestion in the morning and peak hours.
The intersection is expected to be completed in June 2020
For this project, MEKA MB-K110 Stationary was chosen. MEKA MB-K110 provides unmatched solutions for every professional due to completely galvanized heavy, stable main chassis, safe transportation, continuous long-life operation and sensitive weighing.
Click for MEKA K Series C: http://bit.ly/2sG9shl
The construction of the one of the most prestigious marina projects in Les Almadies, Dakar, has started with MEKA concrete batching plant. The Spanish company chose MEKA for this major project, which involves the construction of a marina and a luxury hotel by the sea in Almadies.
MoreMEKA has recently installed more than 30 concrete batching plants in the earthquake zone and continues to contribute to the reconstruction of both the superstructure and infrastructure of the region.
MoreOur valued customer, one of Turkey's leading ceramic producers, has decided to transition to sustainable production methods in response to the global raw material crisis.. In this context, it has taken a step that focuses on waste management and resource reuse by drawing attention to the importance of recycling in the sector. To this end, the company collaborated with MEKA and established a special facility for recycling ceramic and sanitary ware products.
MoreMEKA has added a new concrete batching plant in Jordan to its hundreds of concrete batching plant references in the Middle East. MEKA engineers have successfully installed the C 100 Compact Concrete Batching Plant for our customer Al-Moasron, one of the leading companies in the cement industry in Jordan, and concrete production started.
More