RELIABLE, DEPENDABLE, FLEXIBLE BATCHING PLANTS
Powerful trough local support
MEKA
together with our local solution partner Berkshire Engineering Supplies (BES)
is proud to be a part of one of the most important and prestigious
infrastructure projects in the UK. Despite the difficulties the Global Pandemic
has presented, which includes a restriction on international travel, BES has
ensured we are able to serve one of the largest projects of our time.
A
Dependable Solution Partner for a project that will Rebalance UK Economy
MEKA
Batching Plants has become the number one choice for a number of major
construction projects all over the world. Thanks to our valued partnership with
BES, MEKA is proud to now be considered a market-leading manufacturer for
Batching Plants in the UK. Our growing reputation for quality and reliability
has resulted in several orders for batching plants in the UK, some of which are
being utilized on several high profile construction projects in the UK, which
include: Hinkley Point C Nuclear Power Station, Heathrow Airport Extension, and
RAF Marham, the new Home of F35 fighter jet. MEKA and BES are also glad to
announce that the MEKA will be supplying a number of batching plants for the
first stage of the HS2 High-Speed Railway Project.
Serving the best of best
It is no
surprise that MEKA has become a reliable partner for many of the major
contractors in the ENR list. We have an extensive knowledge-base and
adaptability when it comes to specialty and high capacity projects ranging from
dams, motorways, bridges, runways, and airports.
HIGH
SPEED TWO: AN ENGINE FOR GROWTH
More About
HS2?
HS2 is a
state-of-the-art, the high-speed railway which is critical for the UK’s low carbon
transport future. It will provide much-needed rail capacity across the country
and is an integral part of the rail projects linking the North and South –
helping to rebalance and strengthen the UK economy. HS2 will pass through 8 of
the 10 largest Cities in the United Kingdom and is the largest infrastructure project
in Europe. There will be 32 miles of tunnels, over 10 miles of viaducts, and
Best of all, it will also be the largest environmental project in the UK,
preserving and investing in nature along the way.
Equipment
Contracts for Phase One has been Signed:
So far, 3 x
custom-built, state of the art, MEKA Batching Plants have been ordered for the
first stage of HS2 and we take extreme pride in being selected for the most
prestigious project of our time. Being able to engineer and manufacture the
complete project in-house has allowed us to serve the quality and reliability
expectations of our customers.
The bidding
process for HS2 was long and cumbersome and our production facilities, previous
references, and technical details; were all dissected in great detail. We have
also competed against many respected global manufacturers, however, the
Berkshire Engineering and MEKA solution was chosen as the preferred option, for
which we are extremely proud.
A
Custom Solution Tailored to Project;
The design
process of most infrastructure projects dates back many years before the
initiation of any RFQs for equipment. HS2 officially started back in 2009 and
the equipment had to comply with a long list of pre-requisites. These
pre-requisites stemmed from a long list of conditions, which included;
environmental impact reports, local community requests, transportation of raw
materials and and the requirement to produce a variety of specialty for different sections of the project and MEKA and BES were able to
offer a solution that best meet their requirements.
The Mexican aggregate production industry is evolving faster than ever. The increasing demand for roads, housing and infrastructure in the country creates a need to produce more and more raw materials at competitive prices with minimal environmental impact. The constant and consistent supply of quality aggregates is one of the industry’s prime challenges.
MoreIn our 250 t/h capacity plant, which we established in Bou Saâda, Algeria, superior performance and efficiency have been achieved.
MoreM100 and M120 mobile concrete batching plants were the cornerstones of a new residential complex in Al-Mansour, Baghdad. In this comprehensive project, our customer, who had previously completed successful projects with our K145 model, preferred MEKA's mobile solutions this time as well. This complex, consisting of 30 units 12-storey buildings in total, was designed to meet all the needs of modern life.
MoreThe construction of the one of the most prestigious marina projects in Les Almadies, Dakar, has started with MEKA concrete batching plant. The Spanish company chose MEKA for this major project, which involves the construction of a marina and a luxury hotel by the sea in Almadies.
More