This gorgeous island can now benefit from the availability of a MEKA Plant in Mandeville with a 350 tons per hour production capacity.
3 stageplant is designed with the support of our valuable solution partner for Dolomitic Limestone and is intended for producing 3 sizes of Aggregates and sand.
Ultra High Frequency Fine Sand Screening Unit
is also incorporated in the plant for the production of masonry and sand.
EQUIPMENT SELECTION
Feed Hopper with 30 m³ volume,
Steel
Construction Feeding Ramp
MGF 1260 Grizzly Feeder,
MSIH 1115 CR Secondary
MTI 1115 CR Tertiary Impact
MS 2460/3
Inclined Screens (2 pcs)
MS 1650/2
Inclined Screen for waste
Ultra High-Frequency Screen
Surge Bins with Vibrating Feeders
Belt
Conveyors
Belt Scales
Electrical Control System
MEKA contributes to Georgia's hydroelectric developments by providing the M100 mobile concrete batching plant for two major power plant projects in the Guria region. With a production capacity of 100 m³ per hour and durable features designed for challenging environments, MEKA ensures efficient concrete production, reinforcing its commitment to excellence in global infrastructure projects.
MoreThe Tunisian company, one of the largest contracting companies in the country, which will realize the important highway project in Tunisia, did not want to take risks in this critical project and preferred MEKA MB-100W batching plant.
MoreThe Mexican aggregate production industry is evolving faster than ever. The increasing demand for roads, housing and infrastructure in the country creates a need to produce more and more raw materials at competitive prices with minimal environmental impact. The constant and consistent supply of quality aggregates is one of the industry’s prime challenges.
MoreIn our 250 t/h capacity plant, which we established in Bou Saâda, Algeria, superior performance and efficiency have been achieved.
More