Kazakhstan, which is the biggest country among the Turkish Republics in Central Asia, continues to renovate and develop infrastructure with diverse projects. On a geographical scale, Kazakhstan is three times bigger than Turkey however the density of the population is four times less than of Turkey’s. Therefore, the settlements in the country are lowly populated and are at great distances from each other. Considering these conditions, some difficulties are faced in providing infrastructure services to the entire population in the northern part of the country that is dominated by a severe winter climate.
Contractor companies, which work under these hard circumstances, prefer working with construction machines and plants, which provide a qualified service and that are not in the need of constant repair and maintenance for accomplishing their commitment. In this context, Meka was chosen again by Kazakhstan for previously having met the exactions and for its compliance with the specifications on the former projects.
Meka has set up plants in Astana; MB-100M, MB-60W, MB-C30, in Almaata; MB-60M, MB-60LM, in Aktobe MB-100M, in Kostanay MB-60M, in Ust-Kamonogorsk MB-C60 and in Talas MB-60M for being used in various projects.
Meka, with its superior technology and quality, continues to give a trouble-free service for Kazakhstan just as it does for 80 countries all around the world.
MEKA contributes to Georgia's hydroelectric developments by providing the M100 mobile concrete batching plant for two major power plant projects in the Guria region. With a production capacity of 100 m³ per hour and durable features designed for challenging environments, MEKA ensures efficient concrete production, reinforcing its commitment to excellence in global infrastructure projects.
MoreThe Tunisian company, one of the largest contracting companies in the country, which will realize the important highway project in Tunisia, did not want to take risks in this critical project and preferred MEKA MB-100W batching plant.
MoreThe Mexican aggregate production industry is evolving faster than ever. The increasing demand for roads, housing and infrastructure in the country creates a need to produce more and more raw materials at competitive prices with minimal environmental impact. The constant and consistent supply of quality aggregates is one of the industry’s prime challenges.
MoreIn our 250 t/h capacity plant, which we established in Bou Saâda, Algeria, superior performance and efficiency have been achieved.
More