In Hendvågen Averøy,Norway there will now be quay facilities for unloading stone and gravel from the gravel pit that the company disposes of. Large amounts of rock masses and gravel in various sizes can be loaded onto ships. The aim is to size so that two ships can load simultaneously. For this project, MEKA conveyor belt has been built from the gravel pit to the quay. MEKA conveyor belt with 300 m come from the gravel pit to the right and cross the Hendveien
MEKA continues to be the choice of professionals all over the world with its unique solutions.
Due to the high demand for aggregates in southeastern Anatolia Türkiye, CANTOMA, wanted to install a new crushing plant in the limestone quarry to increase production capacity and the quality of the end products. MEKA has been chosen as partner for this new strategic project. A complete new crushing plant with 1000 tons/hour capacity was delivered for the production of concrete aggregates and manufactured sand.
MoreMEKA , Uganda'nın WAKISO Bölgesi'nde bir kırma ve eleme tesisinin teslim edildiğini duyurmaktan gurur duyar. MEKA 'nın Afrika'daki birçok proje için güvenilir bir ortak haline gelmesi hiç de şaşırtıcı değil. Tesisin tamamını kendi bünyemizde tasarlayıp üretebilmemiz, müşterilerimizin kalite ve güvenilirlik beklentilerine hizmet etmemizi sağladı.
MoreMEKA contributes to Georgia's hydroelectric developments by providing the M100 mobile concrete batching plant for two major power plant projects in the Guria region. With a production capacity of 100 m³ per hour and durable features designed for challenging environments, MEKA ensures efficient concrete production, reinforcing its commitment to excellence in global infrastructure projects.
MoreThe Tunisian company, one of the largest contracting companies in the country, which will realize the important highway project in Tunisia, did not want to take risks in this critical project and preferred MEKA MB-100W batching plant.
More