MEKA Rock on Rock Vertical Shaft MVI 90 started operation in the middle of the World for limestone
Meka MVI90 has a tested and proven rotor that functions like a high-speed dry stone pump that launches rocks at a continuous pace.
The material fed into the machine accelerates in the rotor, and is continuously launched inside the chamber at speeds of 50–75 m/sec. . This process forms a stone lining and causes the MVI90 to instigate a and grinding chain reaction.
This, along with other variables, including rotor diameter, rotor speed and chamber profile, can increase power efficiency, reduce abrasion, provide efficient control of the grinding and process, and adjust the fineness of the produced material from minimum to maximum.
Our valuable customer is already operating five of our concrete plants and we take extreme pride in being chosen by them for the supply of aplant for their road construction project in Tarsus, Mersin.
MoreExplore the remarkable partnership between Meka and Yapi Merkezi in the monumental Divaca-Koper Railway project, driving Slovenia's infrastructure to new heights.
MoreMeka has installed a new C 120 Compact Type Concrete Batching Plant together with its Kuwait dealer BOODAI Trading Company for their Customer who is one of the biggest ready-mix manufacturers in Kuwait.
MoreMeka Engineers installed a new C30 Compact Concrete Plant for a zinc and lead mine in North Macedonia. This mine is the largest underground operating mine in the Republic of North Macedonia. It is located approximately 150 km east of the capital Skopje and 12 km north of Makedonska Kamenica.
More