Special 135, 180 and 250 m³/h capacity MEKA are used for Istanbul 3rd Airport project which will have the greatest passenger capacity. Within the scope of supply of this plant project aiming for speed, high capacity and simultaneously high accuracy and quality, a unique Aggregate Bin is used. These bins which are designed completely by MEKA have individual weighing systems. Under each section that has 75 m3 capacity, there is a weighing hopper only for that section. Total capacity of the bin with 5 sections is more than 375 m3. Optionally, it is also possible to produce a bin with 4 sections and 300 m³ capacity.
Individual weighing system can simultaneously weigh all types and sizes of aggregates in each section in the recipes and can reach a significant speed in cases where more than 2 types of aggregate is used. Apart from that, it has high accuracy up to 1/1000 since weighing card is added to PLC for weighing hopper under each section and weighing hopper is only for that type of aggregate.
MEKA has proven once more that it is the choice of Professional, and it continues to provide services for the industry with its strong engineering infrastructure and to be one of the best choices in important projects worldwide.
MEKA contributes to Georgia's hydroelectric developments by providing the M100 mobile concrete batching plant for two major power plant projects in the Guria region. With a production capacity of 100 m³ per hour and durable features designed for challenging environments, MEKA ensures efficient concrete production, reinforcing its commitment to excellence in global infrastructure projects.
MoreThe Tunisian company, one of the largest contracting companies in the country, which will realize the important highway project in Tunisia, did not want to take risks in this critical project and preferred MEKA MB-100W batching plant.
MoreThe Mexican aggregate production industry is evolving faster than ever. The increasing demand for roads, housing and infrastructure in the country creates a need to produce more and more raw materials at competitive prices with minimal environmental impact. The constant and consistent supply of quality aggregates is one of the industry’s prime challenges.
MoreIn our 250 t/h capacity plant, which we established in Bou Saâda, Algeria, superior performance and efficiency have been achieved.
More