Granite Products demanded a plant that can be fed from the quarry in lower elevation and that can meet all special eeds considering local market conditions and the site they own. After a long working process, MEKA and BERKSHIRE has developed a special plant. A plant consisting of two main chasse with one aggregate bunker was presented to the client. One of the main chasse has 2 m³ planet mixer and it is suitable for Wet, Dry and Semi-Wet production frequently used in UK. Unlike Dry cement, sand, water and additives are mixed in the mixer while other aggregates are directly unloaded into the truck mixer during Semi-Wet production. Therefore higher quality is produced within a shorter period compared to dry while abrasion-resistant components of the mixer are protected. Other body which was designed for smaller and more specific needs has 0,5 m³ planet mixer. MEKA/BES partnership providing a unique and excellent solution has proudly managed to have this project.
High quality and reliable MEKA products are welcomed worldwide while managing to be one of the first choices of professionals in UK thanks to the support and experience of BERKSHIRE. As MEKA and BERKSHIRE, we believe that MEKA brand will be very well-known in a short time not only in UK, but in entire Europe.
The Mexican aggregate production industry is evolving faster than ever. The increasing demand for roads, housing and infrastructure in the country creates a need to produce more and more raw materials at competitive prices with minimal environmental impact. The constant and consistent supply of quality aggregates is one of the industry’s prime challenges.
MoreIn our 250 t/h capacity plant, which we established in Bou Saâda, Algeria, superior performance and efficiency have been achieved.
MoreM100 and M120 mobile concrete batching plants were the cornerstones of a new residential complex in Al-Mansour, Baghdad. In this comprehensive project, our customer, who had previously completed successful projects with our K145 model, preferred MEKA's mobile solutions this time as well. This complex, consisting of 30 units 12-storey buildings in total, was designed to meet all the needs of modern life.
MoreThe construction of the one of the most prestigious marina projects in Les Almadies, Dakar, has started with MEKA concrete batching plant. The Spanish company chose MEKA for this major project, which involves the construction of a marina and a luxury hotel by the sea in Almadies.
More