Considering the first investment costs, mixer of MB-120W model with 120 m³/hour capacity was increased from 3,0 m³ to 3,33 m³ without any change made in listing price (purchase cost). With this implementation, the capacity has increased to 135 m³/hour. Depending on the mixing duration, this is the most efficient plant in its class with maximum 153 m³/hour capacity with said modification.
Again, mixer of MB-180W model with 180 m³/hour capacity was increased from 4,5 m³ to 5,0 m³ and the capacity was changed to 200 m³/hour without any change made in listing price (purchase cost). This that has the highest capacity in MEKA’s standard product range is frequently used for many special applications other than ready-made
This implementation targeting truck mixers with 10 m³ capacity commonly used domestically provides flexibility for the user and allows production capacity increase without additional costs and without purchase cost increase.
MEKA is known as a reliable and flexible producer worldwide and it continues to develop more quality, faster and sturdier products with its strong R&D team and engineer staff.
Due to the high demand for aggregates in southeastern Anatolia Türkiye, CANTOMA, wanted to install a new crushing plant in the limestone quarry to increase production capacity and the quality of the end products. MEKA has been chosen as partner for this new strategic project. A complete new crushing plant with 1000 tons/hour capacity was delivered for the production of concrete aggregates and manufactured sand.
MoreMEKA , Uganda'nın WAKISO Bölgesi'nde bir kırma ve eleme tesisinin teslim edildiğini duyurmaktan gurur duyar. MEKA 'nın Afrika'daki birçok proje için güvenilir bir ortak haline gelmesi hiç de şaşırtıcı değil. Tesisin tamamını kendi bünyemizde tasarlayıp üretebilmemiz, müşterilerimizin kalite ve güvenilirlik beklentilerine hizmet etmemizi sağladı.
MoreMEKA contributes to Georgia's hydroelectric developments by providing the M100 mobile concrete batching plant for two major power plant projects in the Guria region. With a production capacity of 100 m³ per hour and durable features designed for challenging environments, MEKA ensures efficient concrete production, reinforcing its commitment to excellence in global infrastructure projects.
MoreThe Tunisian company, one of the largest contracting companies in the country, which will realize the important highway project in Tunisia, did not want to take risks in this critical project and preferred MEKA MB-100W batching plant.
More